Quick answer / TL;DR: Short answer: use outdoor-rated cable with UV-resistant jacket, in conduit or on tray rather than exposed, and provide surge protection at both ends of any run that leaves a building. Compute PoE voltage drop over the actual length, because a camera that powers indoors may not power at the far end of a ramp. Keep connections inside enclosures.
Three installation methods, three cable specifications: aerial, conduit, burial.A parking installation places cable outdoors, often in conduit or on structures, and powers cameras and payment terminals over the same cable that carries data.
That combination of weather, distance and PoE is what distinguishes it from an indoor network, and it is where most failures originate.
This article covers the jacket and UV requirements, the surge protection that parking structures need, and the distance arithmetic for PoE.
An indoor cable installed outdoors fails from UV degradation of the jacket, which appears as surface cracking and then as moisture ingress.
The failure is slow and is usually attributed to the connector, because that is where the symptom appears.
Surge is the second outdoor problem. A structure with tall metal posts and long cable runs collects induced energy, and a camera at the far end is the component that absorbs it.
Outdoor Requirements
| Requirement | Practice | Failure if ignored |
|---|
| Jacket | UV resistant, outdoor rated | Cracking after a season |
| Route | Conduit or tray, not exposed | Mechanical and UV damage |
| Connections | Inside enclosures | Moisture ingress |
| Surge | Protection at both ends | Camera damage after storms |
| Distance | Compute at actual length | PoE device resets |
The surge row is a cost decision that is almost always made wrongly. Protection at both ends costs a fraction of a camera replacement and of the access equipment needed to replace it.
Where a run leaves a building, treat it as an outdoor run even if most of its length is inside, because the entry point is where the surge arrives.
PoE Over Distance
PoE voltage drop rises with length and with current, and a camera with infrared illumination draws considerably more at night than in daylight.
Sizing on the daytime figure produces a camera that works at commissioning and resets at night, which is reported as an intermittent fault.
Compute using the maximum draw and the full length, including the patch leads at each end.
Where the arithmetic is marginal, use a higher gauge cable or move the switch closer rather than accepting the risk.
Installation and Maintenance
- Keep every connection inside a weatherproof enclosure
- Provide a drip loop before each entry
- Label runs by structure and position
- Record the measured voltage at each device at commissioning
- Inspect enclosures and cable entry points annually
Real-World Applications
A multi-storey car park powers cameras on each deck from switches at the core. Distances are short and PoE margins are comfortable.
A surface car park feeds a barrier camera two hundred metres away. The camera resets at night, and the cause is voltage drop at maximum infrared draw.
A storm damages cameras on the top deck. Surge protection at both ends would have limited the loss to the protector.
An outdoor run is installed in indoor cable and fails after a summer. The jacket has cracked and moisture has entered at a bend.
Standards and Verification
Outdoor cable performance is published by the manufacturer including UV and temperature ratings, and PoE classes are defined by the IEEE 802.3 amendments.
Verification is certification of each link plus a measured voltage at each PoE device under maximum load, recorded for comparison.
Measure at night if the device has illumination. That is when the load is real.
Enclosures and Access
Place enclosures where a technician can reach them without closing the facility, because an inaccessible enclosure turns a five-minute swap into a scheduled closure.
Label each enclosure with the runs it serves, and record the measured voltage at each device inside the door.
Inspect enclosures after severe weather rather than annually, because that is when water enters and when the evidence is still visible.
Keep a spare protector and a spare patch lead in each enclosure, since those are the two items that fail together.
Where a deck has no convenient switch position, place a small industrial switch in an accessible enclosure on the deck rather than running every camera back to the core.
Where payment terminals share a run with cameras, separate them onto different switches. A camera fault that resets a switch should not take payment offline.
Treat payment availability as the critical function on the site, because it stops revenue immediately while a camera fault does not.
Where a deck has no convenient switch position, place a small industrial switch in an accessible enclosure on the deck rather than running every camera back to the core.
Record the position of each enclosure and the voltage measured at each device, so a later fault starts from facts.
Related reading: PoE++ cable requirements — blogs/news/poe-plus-cable-requirements
Related reading: Ethernet cable for cold storage — blogs/news/ethernet-cable-for-cold-storage
Related reading: Industrial cable tray vs conduit — blogs/news/industrial-cable-tray-vs-conduit
A camera that works at commissioning and resets at night is a voltage-drop problem, not a camera problem.
Frequently Asked Questions
Can I use indoor cable outdoors?
No. UV degrades the jacket and it cracks, admitting moisture at the first bend.
Why does my camera reset at night?
Infrared illumination raises the current, and voltage drop over a long run reduces the supply below the device minimum.
Do I need surge protection?
Yes on any run leaving a building. Protection is far cheaper than replacing a camera at height.
How do I size PoE for distance?
Use the maximum draw and the full length including patch leads, then measure at commissioning.