EtherCAT Cable Length Limits: The Budget Is Per Segment
Quick answer / TL;DR: Short answer: 100 metres applies to each cable run between two adjacent EtherCAT devices, so a line of 40 nodes can span several kilometres. What accumulates is propagation delay of roughly 5 nanoseconds per metre, which the protocol measures during startup and compensates for. Practical limits come from cabinet placement, cable routing and the number of hops rather than from a single total length.
The 100-metre wall is a standard, not a suggestion: three legitimate ways past it.The hundred metre figure is the most quoted and least understood number in industrial Ethernet. It is a limit between two adjacent nodes, not a limit on the machine, and confusing the two produces both over-cautious designs and machines that fail at the far end.
What actually accumulates across a long EtherCAT line is propagation delay, and delay is measured and compensated by the protocol rather than being a hard wall. The wall is elsewhere: at each hop's physical layer.
This article separates the per-hop limit, the accumulated delay, and the practical constraints that decide where you place a cabinet.
EtherCAT runs on 100BASE-TX at the physical layer, and 100BASE-TX carries a 100 metre channel limit between two ports. Every device on the line is a two-port node that forwards the frame, so every device restarts the 100 metre budget.
This is why a conveyor line 600 metres long with 30 drives on it is not a problem, while a single 130 metre run from a cabinet to the first device is.
What Actually Accumulates
| Quantity | Value | Limit type |
|---|
| Cable run between nodes | 100 m | Hard, physical layer |
| Propagation delay | about 5 ns per metre | Measured and compensated |
| Delay per slave | sub-microsecond processing | Counts toward cycle time |
| Number of devices | up to 65,535 per network | Protocol limit |
| Total line length | sum of runs | Practical, not hard |
The delay figure matters because EtherCAT distributed clocks compensate for it. The master measures round-trip delay during startup, so a long line with consistent cable behaves predictably.
The consequence is that a long line does not fail because it is long. It fails when a single run exceeds the physical limit, or when the accumulated delay plus device processing exceeds the cycle time the application asked for.
Where the Real Constraints Sit
- A single run over 100 metres, which no amount of protocol compensation fixes
- Cable that was certified at 100 metres but installed at 95 metres with tight bends near both ends
- Adding a device mid-line without re-running the delay measurement, which changes the compensation
- Mixing cable constructions in one line, which produces impedance discontinuities that cost margin
- Using a repeater or switch where a device was intended, which changes the topology model
Real-World Applications
A warehouse conveyor system spans 400 metres with 22 drives. Each run is under 20 metres because the drives are distributed along the line, and the total length is irrelevant to the design. The constraint was where to place the four cabinets.
A machine tool has one cabinet and a remote operator panel 120 metres away. The panel cannot be reached directly, so the last segment uses a switch in an intermediate enclosure, which restarts the 100 metre budget at that point.
A test rig with a moving gantry runs a drag-chain cable of 15 metres that flexes continuously. The length is trivial and the flex life is the whole problem, so the cable is selected on cycle rating rather than on distance.
A retrofit adds eight devices at the far end of an existing line. The delay budget is recalculated rather than assumed, because the added devices raise both the accumulated delay and the frame length.
Standards and Verification
EtherCAT is specified in IEC 61158 and IEC 61784-2, with the EtherCAT Technology Group publishing the physical layer and installation guidance. 100BASE-TX and its channel limits come from IEEE 802.3, and copper channels are certified under ISO/IEC 11801 and TIA-568.
Verification is a channel certification per run, not per line. A line with 20 runs needs 20 results, because the constraint is per hop and an average proves nothing.
Record each run's length alongside its certification. When a device is added later, the record is what allows the delay budget to be recalculated instead of re-measured.
Planning a Long Line
Place cabinets first and let cable lengths follow. A line designed from the cabinet outwards tends to produce one or two runs that exceed the limit.
Where a long run is unavoidable, an intermediate enclosure with a switch or repeater is the standard answer, and it also gives a diagnostic access point.
Keep a length register alongside the certification results. When a device is added, the register answers whether the run will still fit without a site visit.
Related reading: EtherCAT cable selection — blogs/news/ethercat-cable
Related reading: EtherCAT G cable — blogs/news/ethercat-g-cable
Related reading: Ethernet cable bend radius — blogs/news/ethernet-cable-bend-radius
If a run needs to exceed 100 metres, the answer is an intermediate device or a fibre segment, not a longer cable. No cable construction extends 100BASE-TX beyond its channel limit.
Frequently Asked Questions
Is the EtherCAT limit 100 metres total or per segment?
Per segment. The 100 metre limit applies between two adjacent devices, so a network with many devices can span kilometres in total.
Does long cable slow the cycle time?
It adds propagation delay of about 5 nanoseconds per metre, which the protocol measures and compensates. Cycle time is affected more by the number of devices than by total cable length.
Can I use a repeater to extend an EtherCAT run?
A repeater or switch can extend reach, but it changes the topology model and must be accounted for in the configuration. It is not a transparent cable extension.
Why does my line work on the bench and fail on site?
Usually because the site cable is longer per hop, or has tighter bends near terminations, or uses a different construction than the bench cable. A certification per run finds it.
Sourcing cables for a project, a store, or a private-label line? Contact our B2B sales team for specifications, certification evidence, and volume terms – FOB and CIF options available. Request a quote or sample.