SFP28 vs SFP+: What Changes at 25 Gbps
Quick answer / TL;DR: Short answer: SFP28 provides 25 Gbps in an SFP+ sized cage, while SFP+ provides 10 Gbps. A 25G port usually accepts a 10G module and runs at 10G, but a 10G port will not run a 25G module. SFP28 optics use 25GBASE-SR or LR with similar fibre types and shorter reaches than their 10G equivalents.
Fiber cords: two connector families, two fiber types, three polish options.SFP28 fits the same cage as SFP+ and looks identical. That physical compatibility causes more misconfiguration than any other part of a 25G rollout.
The differences are in the electrical specification, the optics and what the switch will negotiate.
The Physical Similarity
Both use the same cage, the same connector and the same latching mechanism. A 25G module physically fits a 10G port and produces no link.
That is why labelling matters. In a mixed switch, an unlabelled module is a diagnostic problem waiting to happen.
| Specification | SFP+ | SFP28 |
|---|
| Speed | 10 Gbps | 25 Gbps |
| Cage | SFP+ | SFP+ |
| Electrical lanes | 1 at 10G | 1 at 25G |
| Typical optic | 10GBASE-SR | 25GBASE-SR |
| Reach on OM4 | 400 m | 100 m |
| Backward compatible | n/a | yes to 10G |
Backward compatibility runs one way. A 25G port accepts a 10G module at 10G, and a 10G port does not accept a 25G module at all.
Reach and Fibre
25GBASE-SR reaches about 70 metres on OM3 and 100 on OM4, which is shorter than 10GBASE-SR because the signalling rate is higher over the same fibre.
That reduction catches people upgrading a link that already runs at 300 metres on multimode at 10G. The same fibre cannot carry 25G that far.
- OM3: about 70 m at 25G
- OM4: about 100 m at 25G
- Single-mode LR: 10 km
- DAC: 3 to 5 m at 25G
- AOC: longer, active
Where the existing multimode run exceeds the 25G reach, the options are single-mode with LR optics or an active optical cable, both of which mean new cable.
Where 25G Pays
25G is the current server access speed in data centres because it matches the PCIe bandwidth of a modern server without the cost of 40G or 100G optics.
For a small office, 10G remains the sensible choice. The switch cost and the cabling requirement of 25G are difficult to justify below a certain scale.
Where a single link needs more than 10G, 25G is often cheaper than 40G because it uses one lane rather than four and needs one module rather than a quad assembly.
Coding and Vendor Locks
25G modules are subject to the same vendor coding restrictions as 10G. A generic module in a locked switch fails to link, and the fix is a coded module or an unlocked port.
Check whether the switch supports third-party optics before ordering in volume. Discovering the restriction after delivery is expensive.
Record the module part numbers per port. In a mixed 10G and 25G environment, that record is the difference between a quick diagnosis and a long one.
Migration Paths
A switch with 25G ports can run 10G modules today and 25G later, which is the usual reason to buy above the current requirement.
Check the switch's port grouping as well. On some models, a 25G port shares bandwidth with a neighbouring cage, so populating both reduces the speed of each.
Fibre reach, not switch capability, is usually the constraint on that upgrade. Multimode installed for 10G at 300 metres cannot support 25G at the same distance.
Where the run is long, plan the single-mode upgrade with the switch upgrade rather than after it.
Check whether the switch supports 25G on every port or only on a subset. Some models provide 25G on uplinks and 10G on access ports, which changes what the upgrade achieves.
Real-World Applications
Server access in a data centre
25G to each server over OM4 within 100 metres, with 100G uplinks from the top-of-rack switch.
Storage network
25G links between storage arrays and switches, where the throughput matters more than the port count.
Small office upgrading from 10G
Usually unnecessary. 10G over Cat6a or multimode meets the requirement at lower cost.
Lab with a high-throughput workstation
A single 25G link to a workstation over a short DAC, avoiding a switch upgrade.
Action: Three Steps
First, confirm the port speed at both ends. A 25G module in a 10G port produces no link.
Second, measure the existing fibre run against the 25G reach for that fibre type, not the 10G figure.
Third, label every module with its speed. Mixed cages are otherwise a permanent source of confusion.
Related reading: 10G SFP+ modules — blogs/news/10g-sfp
Related reading: SFP to RJ45 modules — blogs/news/sfp-to-rj45-module
Related reading: Multimode versus single-mode fibre — blogs/news/multimode-vs-singlemode-fiber
Standards and Verification
SFP28 is defined by SFF-8402 for the electrical interface, and 25GBASE-SR and LR by IEEE 802.3by. The cage is the same as SFP+ under SFF-8431.
Autonegotiation between 10G and 25G is not universal. Many links require both ends configured to the same speed rather than negotiating it.
Verification: check the switch reports the link at the expected speed, then read the optical receive power. A link that comes up at 10G with a 25G module installed indicates a speed setting rather than a hardware incompatibility.
Frequently Asked Questions
Will a 25G module work in a 10G port?
No.
Will a 10G module work in a 25G port?
Usually yes, at 10G.
How far at 25G on OM4?
About 100 metres.
Is 25G worth it for a small office?
Rarely. 10G is usually sufficient.
Do I need new fibre?
Only if the run exceeds the 25G reach.
Sourcing cables for a project, a store, or a private-label line? Contact our B2B sales team for specifications, certification evidence, and volume terms – FOB and CIF options available. Request a quote or sample.